435,00 €
The PB-PC S7 Valve Cutting Ring is a key component for the proper operation of CIFA and Zoomlion concrete pumps. Located in the “S”-shaped valve system, this ring ensures effective cutting of the concrete between the cylinders and the distribution valve, guaranteeing continuous, precise, and safe pumping.
In Stock
Benefits:
✅ Precise concrete cut: Ensures efficient sealing and a smooth transition between pumping cycles.
✅ High wear resistance: Manufactured with reinforced materials, it withstands the friction and abrasiveness of concrete.
✅ Compatibility with CIFA and Zoomlion: Ideal fit for PB-PC pumps with S7 valves, ensuring full efficiency.
✅ Reduced maintenance costs: Extends the system’s service life and reduces unplanned downtime.
✅ Ideal for professional use: Excellent performance on job sites that demand high productivity and reliability.
Application:
Suitable for CIFA and Zoomlion concrete pumps with PB-PC S7 valves, the cutting ring is installed in the area where it contacts the “S”-shaped valve, ensuring a tight seal and precise cutting of the concrete during the pumping cycle.
| Weight | 7000 g |
|---|---|
| Dimension |